By the Numbers / Data Centers
A data center turns electricity into heat. The computing is what happens along the way. Nearly every decision in the building comes down to two jobs: get the heat out, and keep the power on.
Each section starts with a story, gives you the number, explains why, then hands you a tool to push on. Every big number comes with something familiar next to it, so you can feel how big it is.
Each strand's width is energy. Follow any of them to the right and it ends up as heat, because computing stores no energy worth counting: a bit flips, and the electricity that flipped it is warmth a moment later. Drag the slider to see what better and worse buildings look like. The split of overhead (65% cooling, 25% power chain, 10% other) is a toy assumption.
ENIAC was switched on in Philadelphia in 1946. It filled a room 30 by 50 feet, weighed 30 tons and drew about 150 kilowatts (sources range from 140 to 174). It ran day and night, partly because leaving it on was easier on the vacuum tubes, and it needed air conditioning of its own. You may have heard that the lights of Philadelphia dimmed when it started up. That one is a legend. The heat was real.
Today a single rack of Nvidia GPUs, about the size of a refrigerator, draws as much as ENIAC did.
A decade after ENIAC, the Air Force built SAGE to watch the skies for Soviet bombers. Each of its direction centers was a four-story concrete blockhouse built around one machine, IBM's AN/FSQ-7, with chilled air pumped through the cabinets. Each needed 3 megawatts, enough that new power lines were run to every site. All that bought 75,000 instructions a second and 256 KB of core memory. These were among the first buildings designed around a computer instead of adapted to hold one.
Now scale up to a country. Berkeley Lab estimates that US data centers used 192 TWh in 2024, 4.7% of all the electricity in the country. That's what about 18 million average homes buy in a year, roughly one American household in seven.
And it's climbing. Berkeley Lab's reference case reaches 649 TWh by 2030, 11.8% of US power, within a range of 9.5 to 15.3%. Worldwide, the IEA puts data centers at 485 TWh in 2025 and, in its 2026 update, about 950 TWh by 2030, close to 3% of the world's electricity. The biggest single project, Meta's Hyperion in Louisiana, is planned at 5 gigawatts on a site Mark Zuckerberg said would cover a large part of Manhattan's footprint. Forecasts like these hang on how many chips get built and how hard they're run, and the reports say as much.
One megawatt for a year is 1 MW × 8,760 h = 8,760 MWh. An average US home bought 865 kWh a month in 2024 (EIA), or 10,380 kWh a year. That's an average draw of 1.2 kW, so 1 MW running flat out is about 840 homes, and 1 GW is about 840,000.
Homes flatter the comparison, because they're only a bit over a third of US demand. Divide all 2025 US electricity, 4,200 TWh, by 341.8 million people and you get about 12,300 kWh per person for everything: homes, offices, factories, streetlights. By that measure a 1 GW campus uses as much as a city of 710,000 people.
Try ENIAC, then Hyperion: about 33,000 times more power. The bars are on a log scale, so each step is ten times the last. Toy assumptions: a home uses 10,380 kWh a year (EIA, 2024); an EV uses 0.35 kWh per mile over 11,071 miles, the 2024 average per US vehicle (FHWA), so about 3,875 kWh; "people" is all 2025 US electricity divided by population. Abilene's 1.2 GW and Meta's 5 GW Hyperion are announced campus sizes, not measured draw.
For most of data center history, a rack of servers drew about as much power as a few houses. Uptime Institute has asked operators about it every year since 2011. In 2026 the most common answer passed 11 kW for the first time. Leave out the few sites designed for more than 30 kW a rack and the average is 7.8 kW, about six or seven homes.
AI racks live in a different world. Nvidia's GB300 NVL72 packs 72 GPUs into one cabinet that draws 132 to 135 kW and peaks near 155. Lenovo rates the next one, Vera Rubin NVL72, at up to 227 kW. Vendor rating, not an Nvidia figure Nvidia has shown a design for 2027, called Kyber, that Jensen Huang said could draw up to 600 kW. They're heavy, too: the IEA notes that one of these racks can weigh more than a pickup truck.
The real problem is floor space. A GB300 rack stands on 0.6 by 1.07 meters. Spread 132 kW over that and you get about 200 kW per square meter, roughly 200 times the power of the noon sun on the same patch of ground. Now try to carry that heat away with air. If the air warms 15 °C on its way through, you need about 7 cubic meters of it every second. That's a 20 km/h wind blowing through the front of the rack, all day, every day.
Air runs out of road quickly, because fan power grows with the cube of airflow. Twice the heat needs twice the air, and twice the air takes eight times the fan power. Uptime puts the practical limit of air cooling at about 50 kW per rack. Past that, the heat leaves through water.
The heat a stream of air carries off is P = ρ·cp·V̇·ΔT. Hold the temperature rise fixed and the airflow V̇ has to grow in step with the rack's power. More air through the same cabinet means faster air, and the pressure needed to push it rises with speed squared. Fan power is flow times pressure, so it grows with flow cubed: twice the air, four times the pressure, eight times the power.
Start at 7.8 kW and drag right. Somewhere near 60 kW the fans alone would need as much power as the servers. Toy assumptions: air warms 15 °C crossing the servers; footprint 0.6 × 1.07 m and an open front of 0.6 × 2.24 m (Supermicro's GB300 rack); noon sunlight about 1 kW/m²; server fans take 3% of a 10 kW rack's power and scale with the cube of airflow through the same cabinet. Real AI racks never try this: above about 50 kW the heat leaves through cold plates and water.
On the Hurricanes page, a hurricane is a heat engine. Heat flows from a warm sea to freezing cloud tops, and some of that flow becomes wind. A chiller is the same machine run in reverse. Instead of getting work out of a flow of heat, it spends work to push heat the wrong way: from the cool water at your servers to the hot air outside. Sadi Carnot worked out the limit on both kinds of machine in 1824.
The number to watch is the coefficient of performance, or COP: kilowatts of heat moved per kilowatt of electricity spent. Under the ASHRAE 90.1 energy standard, a large water-cooled chiller has to reach a COP of about 6.3, so one kilowatt of electricity moves six of heat. That sounds great, and it is, but at the same temperatures physics allows about 9.9. A chiller that just meets the code gets about 60% of the way there.
Look at the bottom of that fraction. The smaller the gap between the water you send to the servers and the air you dump the heat into, the bigger the COP. Halve the gap and the ideal doubles. That's why operators keep running their rooms warmer; ASHRAE now recommends 18 to 27 °C at the server inlet. It's also why Nvidia designed Vera Rubin to be cooled with 45 °C water. Water that hot is warmer than the outdoors almost everywhere, so fans alone can shed its heat and the compressor can stay off. Engineers call that free cooling.
Then there's the fluid. Per degree, a liter of water holds about 3,500 times as much heat as a liter of air. For the same load, a water pipe about as wide as your wrist does the work of an air duct you could walk through. The first tool draws both to scale.
Toy assumptions: air at 1.2 kg/m³ and 1,005 J/kg·K moving at 3 m/s in the duct; water at 998 kg/m³ and 4,182 J/kg·K moving at 2 m/s in the pipe. Both circles share one scale.
Press Classic chilled water, then Same plant, heat wave, then 45 °C liquid. Toy assumptions: heat leaves at outdoor temperature plus 10 °C; a real chiller reaches 60% of Carnot (calibrated to ASHRAE 90.1's minimum at standard rating conditions), capped at COP 15; free cooling runs when outdoor air is at least 5 °C below the supply; pumps and fans add 3 kW per 100 kW. With an evaporative tower, read "outdoor" as wet-bulb temperature, which is lower and is why towers save power and cost water.
In April 2006, at Uptime Institute's first symposium, an engineer named Christian Belady proposed a simple ratio: take everything the building draws and divide it by what the computers draw. He called it power usage effectiveness. The Green Grid, an industry group, published it in February 2007, and it became the number every data center is judged by.
A PUE of 2.0 means one watt of overhead (chillers, fans, UPS losses, lights) for every watt of computing. A PUE of 1.0 would mean no overhead at all.
Google kept its data centers secret for years. Then, on October 1, 2008, it published a PUE of 1.21 across its six company-built sites, at a time when 2.0 or worse was normal. Six months later it held its first Data Center Efficiency Summit to show how. The date was April 1, so Google threw in a joke about an oil-cooled data center. The real reveals sounded stranger: a battery in every server cabinet instead of one big UPS room, and the first video tour of a Google data center built inside shipping containers.
The gap is still there. Uptime's 2026 survey puts the industry average at 1.52, or 1.36 if big sites count in proportion to their size. Google reported 1.09 for its 2025 fleet. Berkeley Lab estimates the US as a whole at 1.45.
It rewards hot servers. Server fans count as IT load. Turn up the room temperature and the chillers work less, so overhead falls, while the server fans spin faster, so IT load rises. PUE improves even when the total bill goes up. Press Google-like in the tool and drag the inlet temperature up to see it.
It ignores water. An evaporative cooling tower uses less electricity than a chiller, so it lowers PUE. It does that by evaporating water, which PUE never counts.
It ignores the work. A hall of idle servers at a PUE of 1.1 wastes more than a busy hall at 1.4. PUE measures the building around the computers and never asks what the computers did.
Percentages are of IT power at 22 °C inlet, for 1 MW of IT. Toy assumptions for the inlet slider, illustrative and not measured: each °C above 22 trims chiller and tower energy by 3%; server fans take 2% of IT power up to 25 °C, then speed up 8% per °C and their power rises with the cube of speed.
In June 2018, Microsoft lowered a steel cylinder the size of a shipping container 117 feet down off Scotland's Orkney Islands. Inside were 864 servers sealed in dry nitrogen. Nobody touched it for two years. The North Sea took the heat and gave up none of its water. When the cylinder came back up in July 2020, crusted with barnacles and sea anemones, its servers had failed at one-eighth the rate of a matching group on land: 6 of 855, against 8 of 135. Microsoft has since shelved the project, but it made a point. Water is a superb place to put heat.
On land, most data centers dump their heat into the air, and on hot days the cheapest way to do that is to let some water evaporate, the way sweat cools you. Berkeley Lab estimates US data centers consumed 17.4 billion gallons (66 billion liters) of water on site in 2023. That's about 26,000 Olympic pools, or what 160,000 American families use at home in a year. The power plants that made their electricity consumed about twelve times as much.
The Green Grid defined water usage effectiveness, WUE, in 2011. Physics sets a floor for it. Evaporating one liter of water soaks up about 0.68 kWh of heat, roughly what a 1 kW space heater puts out in 40 minutes. So getting rid of one kWh of heat by evaporation alone takes about 1.5 liters, plus the extra water flushed out to keep minerals from scaling the tower. Real evaporative sites come in a little under that, because they also shed some heat as plain warm air and stop evaporating when it's cool out. Equinix's evaporative sites reported 1.41 L/kWh for 2025. Microsoft's whole fleet averaged 0.27.
So the real choice is water or electricity. Microsoft's air-cooled designs only use water when it's hotter than 29.4 °C (85 °F) outside: never in Northern Europe, less than 5% of the time in Dublin and Amsterdam, about 10% in Virginia and up to 40% in Phoenix. Its newest design, launched in August 2024, circulates water through cold plates on the chips and evaporates none of it, saving more than 125 million liters a year per data center. The price is what Microsoft calls a "nominal increase" in electricity. Power plants use water too, so the tool counts both.
Press Phoenix, then Cooling tower, all year, and compare the on-site and power-plant bars. Climate presets are Microsoft's stated shares of time its adiabatic designs use water. Toy assumptions: heat rejected is 1.15× IT energy; evaporation takes 1.48 L per kWh of heat, multiplied by N/(N−1) for drain-off at N cycles of concentration; running dry adds the chosen percentage of IT energy. The 4.5 L/kWh grid default is Berkeley Lab's US indirect estimate (211 billion gallons over 176 TWh); it is a national average that includes evaporation from hydropower reservoirs, which some analysts argue inflates it, and local grids vary from near zero to far above it.
SAGE's designers didn't trust one computer, so every direction center got two. One ran the air-defense picture while the other sat warm and ready as a spare. The buildings had their own power plants. A technician who worked in one later described the rule for a cooling failure: if the air conditioning couldn't be restored within 60 seconds, the computer was shut down. Seventy years on, cooling and power are still one problem. A rack without cooling has minutes.
Reliability math comes down to two rules. Things in a chain multiply: three links that each work 99.9% of the time give you 99.7%. Things side by side only fail if all of them fail, so you multiply the failure odds instead. Two independent paths that each fail 0.1% of the time both fail 0.1% × 0.1% = 0.0001% of the time, which makes the pair 99.9999% available. It's the same 1 − (1 − p)n that makes 63% of 100-shard requests wait on at least one slow shard, read the other way round.
N+1 means one spare beyond the N units the load needs. 2N means two complete, independent systems. The grid is the link you can't design away: the average US customer lost power for 263 minutes in 2025, about 99.95% availability, and for 11 hours in hurricane-heavy 2024.
Uptime's four Tiers are usually quoted as 99.671%, 99.741%, 99.982% and 99.995% available. That's 29 hours, 23 hours, 95 minutes and 26 minutes of downtime a year, and some versions give Tier II as 99.749%. Origin uncertain The percentages come from Uptime's early white papers. Today's Tier Standard defines tiers by how a site is built (Tier III can be maintained without shutting down; Tier IV keeps running through any single failure), and this page couldn't confirm that it still states them.
The catch is the word independent. Two paths that share a fuel tank, a control system or a tired technician can fail together, and those shared failures usually cause most of the real downtime at a well-built site. The β slider adds them. Pick 2N, then move β to 5% and watch the nines disappear.
Toy assumptions: failures are independent except for the β share, which fails every redundant copy at once (the beta-factor model); a distribution path is 99.995% available; the UPS rides through the generator's start; maintenance never takes anything offline. Real sites lose most of their downtime to the things this model leaves out.
Many computer rooms have a big red button on the wall: the Emergency Power Off. Press it and the room goes dark. It's there because of Article 645 of the National Electrical Code, which lets a computer room bend some wiring rules under its raised floor, but only if the room has its own cooling and a way to cut all power at once. One trade guide calls the button "infamous and dangerous". The same wording now turns up, almost word for word, in the fire standards for IT and telecom rooms.
That's how a data center is governed: by layers of rules, each written for a different hazard and enforced by a different person. Most are standards rather than laws. An NFPA fire standard becomes mandatory only where the local authority adopts it, usually through the building or fire code, so the same design can be required in one county and optional in the next. The table lists the main categories. The details change by edition and by place, so this page doesn't try to list them.
| Hazard | Main documents | Who enforces |
|---|---|---|
| Fire | NFPA 75 (IT equipment), NFPA 76 (telecom), NFPA 2001 (clean-agent suppression), NFPA 72 (alarms) | Local fire marshal, where adopted |
| Electrical | NFPA 70, the NEC (incl. Article 645), NFPA 70B (maintenance), NFPA 110 (emergency and standby power) | Local electrical inspector |
| Air | EPA rules for stationary engines: 40 CFR 60 subpart IIII and 40 CFR 63 subpart ZZZZ; state air permits for generator fleets | EPA and state air agencies |
| Thermal | ASHRAE TC 9.9 thermal guidelines: 18 to 27 °C recommended inlet, 15 to 32 °C allowable for class A1 | Guidance; enforced by warranties |
| Energy | ASHRAE 90.4, the energy standard for data centers | Where state energy codes adopt it |
| Reliability | Uptime Institute Tier certification, TIA-942 | Voluntary; customers and contracts |
Backup generators are the clearest case of a rule that is just a number. Under federal rules, an emergency diesel engine can run as long as it needs to in a real emergency. Outside emergencies it gets 100 hours a year for maintenance and testing, and up to 50 of those hours can be other non-emergency use. Go over and it stops counting as an emergency engine. A campus with dozens of engines plans its whole test calendar around that budget, and state permits can be stricter still.
Push the monthly test to two hours and the budget is gone before any load-bank test. Federal limits for emergency stationary engines in 40 CFR 60.4211(f) and 63.6640(f); the 50 non-emergency hours are allowed only for specific purposes, and the provisions for emergency demand response were vacated by a court and removed in 2022. State and local permits can be stricter. A teaching tool, not legal advice. The 11-hour outage default is the 2024 US average from EIA.
Guess the PUE from a year's meter readings.
Two independent power paths, each up a fixed share of the time. Guess the availability of the 2N pair.
For about a decade, efficiency won. US data center electricity stayed flat at around 60 TWh from 2014 to 2016 even as the work inside kept growing, because efficiency gains kept pace with demand. Much of that came from hyperscalers driving their PUE toward 1.1.
AI changed the slope. The physics stayed put. Racks went from a few kilowatts to over a hundred, which forced water to the chip. Campuses went from tens of megawatts to gigawatts, which made a grid connection the hardest thing to get. And PUE, built for a time when overhead was the problem, has little to say now that the computing itself is most of the load.
Luiz André Barroso, Urs Hölzle and Parthasarathy Ranganathan, The Datacenter as a Computer. Written by Google engineers and first published in 2009, it treats the whole building as one machine, which is the right frame for everything on this page. Its chapters on energy efficiency and power provisioning explain PUE, server-level PUE and why server utilization matters as much as the building.
Vaclav Smil, How the World Really Works (2022). Not about data centers at all, which is the point. It teaches the habit this page tries to imitate: put every number beside its neighbors in the energy system before deciding whether it is large.
Andrew Blum, Tubes: A Journey to the Center of the Internet (2012). A reporter's tour of exchange points, cable landings and data halls. Light on numbers, strong on what the buildings look and sound like, and a reminder that the cloud is made of buildings.
ASHRAE TC 9.9, Thermal Guidelines for Data Processing Environments. The technical reference behind the 18 to 27 °C recommendation and the liquid-cooling classes. Dry and exact, and the document the rest of the industry cites.
Last verified: 2026-11-25.
The calculators here are deliberately simple models with their assumptions stated; real facility design uses measured loads, weather files and engineering review.